CONCEPTUAL MODEL OF RISK-ORIENTED BUSINESS PROCESS MANAGEMENT IN 7S+R ENGINEERING COMPANIES

Authors

  • F. Tkachenko Cherkasy State Technological University

DOI:

https://doi.org/10.32718/agroengineering2025.29.242-248

Keywords:

business processes, business process management, risk management, engineering companies

Abstract

The article is devoted to the development of a conceptual model of risk-oriented business process management in engineering companies entitled 7S+R, which is based on the classical McKinsey 7S framework and integrates risk management as a cross-cutting element of the organizational system. In today’s dynamic and highly uncertain business environment, engineering companies operate under complicated conditions characterized by high technological complexity of projects, significant investment volumes, multi-level cooperation with subcontractors, and strict regulatory requirements. This leads to the emergence of strategic, operational, financial, human resource, and project risks that directly affect the stability and performance of business processes.

Existing risk management frameworks, including ISO 31000, COSO ERM, and PMBOK, establish general principles and logic of risk management. However, they do not provide sufficient granularity at the level of specific organizational elements and do not allow for the identification of risk sources within the structure of business processes. At the same time, the McKinsey 7S model, which is widely used for organizational diagnostics, focuses on internal organizational alignment but does not explicitly incorporate risks as a systemic management factor.

The proposed 7S+R model addresses this gap by integrating the Risk component into all seven organizational elements - strategy, structure, systems, shared values, management style, staff, and skills. Risk is treated not as a separate management object, but as a multidimensional characteristic that permeates each element of the model and determines its resilience to internal and external threats. This approach makes it possible to move from fragmented risk management toward a comprehensive risk-oriented architecture of business processes.

The practical value of the model lies in its applicability for comprehensive organizational diagnostics, support of strategic and operational managerial decisions, as well as for designing transformation programs and increasing the adaptability of engineering companies in volatile and risk-intensive environments.

References

Austrian Standards Institute. (n.d.). ONR 49000: Risk management for organizations and systems.

Bakhliuk, Yu., & Shevchuk, O. (2019). Model McKinsey 7-S yak instrument otsiniuvannia konkurentnospromozhnosti pidpryiemstva. Ekonomika i orhanizatsiia upravlinnia, 3(31), 159–167. https://doi.org/10.31558/2307-2318.2018.3.17

Committee of Sponsoring Organizations of the Treadway Commission. (n.d.).Enterprise risk management. Retrieved from: https://www.coso.org/SitePages/Guidance-on-Enterprise-Risk-Management.aspx?web=1 (Accessed January 21, 2025).

Danchenko, O. B., & Tkachenko, F. V. (2025). Identyfikatsiia ta analiz ryzykiv biznes-protsesiv v inzhynirynhovykh kompaniiakh za elementamy modeli McKinsey 7S. Upravinnia proiektamy u rozvytku suspilstva. Tema: “Upravlinnia proiektamy pisliavoiennoi rozbudovy Ukrainy”: tezy dopovidei (pp. 103–106). Kyiv National University of Construction and Architecture. Retrieved from: http://upma.kiev.ua/wp-content/uploads/2025/10/Тези-PM_Kyiv25-1.pdf (Accessed January 21, 2025).

Federation of European Risk Management Associations. (2011). A risk management standard. Retrieved from: https://www.ferma.eu/app/uploads/2011/11/a-risk-management-standard-english-version.pdf (Accessed January 21, 2025).

Hayes, J. (2014). The theory and practice of change management. Palgrave Macmillan. Retrieved from: https://drnishikantjha.com/booksCollection/THE%20theory%20and%20practice%20of%20change%20management%20(%20PDFDrive%20).pdf (Accessed January 21, 2025).

International Organization for Standardization. (2018). ISO 31000: Risk management – Guidelines. Retrieved from: https://www.iso.org/standard/65694.html (Accessed January 21, 2025).

International Organization for Standardization. (2019). ISO 22301: Business continuity management systems – Requirements. Retrieved from: https://www.iso.org/standard/75106.html (Accessed January 21, 2025).

Koiuda, P. M., & Koiuda, O. P. (2006). Kharakterystyka ta klasyfikatsiia ryzykiv. Komunalne hospodarstvo mist, (71), 203–214. Retrieved from: https://eprints.kname.edu.ua/1356/ (Accessed January 21, 2025).

Posokhov, I. M. (2012). Suchasnyi stan metodychnoho zabezpechennia upravlinnia ryzykamy korporatsii. Bizines Inform, (10), 266–271. Retrieved from: https://repository.kpi.kharkov.ua/handle/KhPI-Press/1322 (Accessed January 21, 2025).

Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK® Guide) (6th ed., pp. 395–458). PMI.

Proskura, V. F., & Bilak, R. H. (2017). Metodychni pidkhody do upravlinnia ryzukamy. Ekonomika i suspilsto, (9), 599–607. Retrieved from: http://dspace.msu.edu.ua:8080/jspui/handle/123456789/1555 (Accessed January 21, 2025).

Pulina, T. V. (2017). Suchasni aspekty ta metody upravlinnia ryzykamy innovatsiinykh proektiv v Ukraini. Ekonomika ta derzhava, (10), 4–8. Retrieved from: http://www.economy.in.ua/?op=1&z=3871&i=0 (Accessed January 21, 2025).

Standart upravlinnia proektamy ta Nastanova do zvodu znan z upravlinnia proektamy (PMBOK® Guide). 7th edition. Newtown Square, PA: Project Management Institute, Inc., 2021. 370 p.

Stine, K., Quinn, S., Witte, G., & Gardner, R. K. (2020). Integrating cybersecurity and enterprise risk management (ERM) (NIST IR 8286). National Institute of Standards and Technology. https://doi.org/10.6028/NIST.IR.8286

Tsvihun, T. V. (2011). Klasyfikatsiia ryzykiv pidpryiemstva. Ekonomicjni nauky. Seriia: Oblik i finansy, 8(29, Pt. 4), 385–393. Retrieved from: https://elar.khmnu.edu.ua/items/784692c0-c316-41bf-aee7-6165d4d004b8 (Accessed January 21, 2025).

Vakulenko, V., & Raiter, N. (2022). Sut ta klasyfikatsiia pidpryiemnytskykh ryzykiv. Zbirnyk materialiv zvitnoi studentskoi naukovoi konferentsii fakultetu upravlinnia, ekonomiky ta prava Lvivskoho natsionalnoho universytetu pryrodokorystuvannia za rezultatamy naukovo-doslidnoi roboty u 2022 r., 303–306. Retrieved from: https://lnup.edu.ua/uk/fakultety/fakekonomik/4923-zasidannia-v-ramkakh-zvitnoi-studentskoi-naukovoi-konferentsii-za-rezultatamy-naukovo-doslidnoi-roboty-u-2022-rotsi (Accessed January 21, 2025)

Zakharova, N. Yu. (2023). Upravlinnia ryzykamy na pidpryiemstvi: sutnist, pidkhody ta metody. Bizines Inform, (1), 203–209. Retrieved from: http://jnas.nbuv.gov.ua/j-pdf/binf_2023_1_30.pdf (Accessed January 21, 2025).

Zapukhliak, I. B. (2015). Model McKinsey 7S yak instrument otsiniuvannia hotovnosti hazotransportnykh pidpryiemstv do zmin. Naukovyi visnyk Uzhhorodskoho nationalnoho universytetu. Seriia: Mizhnarodni ekonomichni vidnosyny ta svitove hospodarstvo, (3), 136–140. Retrieved from: http://nbuv.gov.ua/UJRN/Nvuumevcg_2015_3_33 (Accessed January 21, 2025).

Published

2026-03-10

How to Cite

Tkachenko Ф. (2026). CONCEPTUAL MODEL OF RISK-ORIENTED BUSINESS PROCESS MANAGEMENT IN 7S+R ENGINEERING COMPANIES . Bulletin of Lviv National Environmental University. Series Agroengineering Research, (29), 242–248. https://doi.org/10.32718/agroengineering2025.29.242-248

Issue

Section

INFORMATION TECHNOLOGIES AND SYSTEMS. PROJECT MANAGEMENT IN AGRO ENGINEERING