Burchenia С., Vikhot С., and Gayda О. “THE RESULTS OF THE TECHNICAL INSPECTION OF THE REINFORCED CONCRETE BRIDGE ACROSS THE DESNA RIVER AT KM. 23+400 OF THE HIGHWAY IN THE CITY OF TURBIV”. Bulletin of Lviv National Environmental University. Series Architecture and Construction, no. 25 (December 23, 2024): 85–91. Accessed January 18, 2025. https://visnyk.lnau.edu.ua/index.php/architecture/article/view/352.